ENGINEERING DEPARTMENT | ||
NO | QUESTION | ANSWER |
1 | How do I report damage in my area? | Any complaints can be made directly online via the MBSJ SISPAA complaints system and the MBSJ Complaints line. |
2 | How many days will follow-up action be taken after the complaint is received? | Refer to the Department's Client Charter. |
3 | What should be done if the complaint is not taken? | If the work is not carried out within the specified period, the complainant can help report it to the Council and a reminder letter will be issued to the contractor until the repair work is completed. |
4 | How to prevent damage | The public must ensure that they do not damage public property such as roads, drains, Council assets, street lights, feeder pillars, traffic lights, slopes, etc. |
5 | Will the complainant be notified while the repair work is being carried out? | Yes, if necessary, such as involving the diversion or closure of the complainant's route/asset and obtaining additional information. |
6 | Can a damage complaint be made if it is outside the complainant's area? | Yes, provided the complaint is accurate and complete. |
7 | Can the complainant refer back to the complaint that has been made? | Complainants must keep the complaint reference number to facilitate the Department's review. |
8 | How many complaints can be made? | No limits. |
9 | Did your party accept the suggestions from the complainant? | Any suggestions are welcome. |
10 | What kind of damage needs to be reported to this Department? | The damage that can be reported is as follows:-
|
ROAD | ||
NO | QUESTION | ANSWER |
1 | Why are there so many damaged and potholed roads? | Old roads that are over 10 years old, high traffic density, heavy vehicles and runoff water accumulating on the road. |
2 | What action is taken if there is damage in the MBSJ area? | Road patching works using premix by the department and also by annual maintenance contractors. |
3 | How long does it take for road damage to be resolved by MBSJ? | For minor damage, immediate repairs are carried out within 3 working days. |
4 | Does closing a road require approval from MBSJ? | Necessary but subject to approval from the Building Department except road excavation permits are subject to approval from the Engineering Department. |
TRAFFIC | ||
NO | QUESTION | ANSWER |
1 | If the traffic light is broken, what will the MBSJ engineering department do? | The complaint will be forwarded to the contractor for action. |
2 | How long does it take to take action if there is a traffic light malfunction in the area? | Immediate action. |
3 | There is a dangerous intersection and traffic is uncontrolled. Can an application for a new traffic light be forwarded to MBSJ if there is a dangerous intersection and traffic is uncontrolled? | The engineering department will review the application for suitability on site. |
4 | What if you want to know if a traffic light belongs to MBSJ? | The traffic lights belonging to MBSJ have an ID placed on the traffic light pole, which is blue and has the MBSJ logo. |
ELECTRICAL | ||
NO | QUESTION | ANSWER |
1 | The types of lamp posts on the street vary, how to distinguish street lights belonging to MBSJ? |
|
2 | If a street light or garden light belonging to MBSJ is found to be damaged or fallen, what action will MBSJ take? | After receiving a complaint from the complainant, the technician will inspect the site regarding the problem and inform the area contractor to take action. |
3 | How long does it take for the MBSJ contractor to resolve the problem of damaged street lights/park lights? | The repair action is for 3 days and the maximum is 14 days. In cases of vandalism such as theft of components in the feeder pillar and feeder pillar being broken/burned, the repair action takes 2 months. (Need to book) |
4 | What if I want to apply for new garden lights/street lights? | Must submit application by letter and can also be done by phone. Installation approval depends on technical review and allocation approval. |
DRAINAGE | ||
NO | QUESTION | ANSWER |
1 | If there is damage to drains and sewers, what action should be taken? |
|
2 | What steps will be taken if flooding occurs in the MBSJ area and how long will it take for MBSJ to resolve the problem? |
|
3 | Is the drainage system built by the developer supervised by MBSJ? | Yes, after the area is handed over to the Council for maintenance. |
4 | If there is a landslide or damaged structure near the drainage system supervised by MBSJ, will MBSJ repair it? |
|
SLOPE | ||
NO | QUESTION | ANSWER |
1 | What actions will MBSJ take if there is a slope / landslide in the MBSJ area? | Investigation and action will be taken with;
|
2 | How long does it take for a complaint about a slope to be resolved? | 1. For the normal complaint category, the time taken to start work is no later than 3 days from the date the complaint is received. |
STRUCTURE | ||
NO | QUESTION | ANSWER |
1 | What action is taken if there is damage to the structure of the premises under the supervision of MBSJ? | A review of the type of damage will be conducted to identify the action that needs to be taken. (either by Council staff or with the relevant contractor) |
2 | How long will it take if there are structural problems at the MBSJ premises? | The repair period is based on the damage and can be categorized into 3, namely:
|
3 | Can problems regarding mechanical & electrical (M&E) for MPSJ premises be channeled to the MBSJ structural engineering department? | Problems regarding Mechanical & Electrical (M&E) can be channeled to the structural department, however action will be taken by the relevant department. |
MECHANICAL | ||
NO | QUESTION | ANSWER |
1 | If there are problems regarding M&E, is the MBSJ mechanical engineering unit responsible? | The Mechanical Division will only manage M&E issues related to MBSJ assets. |
2 | If there is an air conditioning failure at the MBSJ premises, what action will be taken? | Please contact the Mechanical Division and it will be taken care of as soon as possible with the assistance of the appointed annual contractor. |
3 | How long will it take to repair the damage? | The repair period depends on the type of damage and ranges from 1 to 3 days. However, for major damage, the repair period will be notified in writing. |
INFRASTRUCTURE | ||
NO | QUESTION | ANSWER |
1 | Do applications for construction work or projects involving the MBSJ area need to be submitted to the MBSJ engineering infrastructure division? | All applications must be submitted through the OSC counter. |
2 | What documents need to be included with the application to obtain approval from the engineering department? | Approval of Land Work Plan:
Applications Must Have Planning Permission Approval And DID Approval Before Being Eligible To Be Brought To The OSC Meeting Approval Of Road And Drainage Plans:
The developer must make a presentation for the development's TIA report before approval. |
3 | How long does it take for each application to receive approval from MBSJ? | The processing period for an approval application is 14 working days. For land work plan applications, approval is subject to the decision of the OSC meeting which is held every 2 weeks. |
Submitted by muhammad.shah on Wed, 26/02/2025 - 8:39am